Pull Request Overview
- Opened on October 9, 2026
- Status Merged
- Commit count 1 with first commit October 9, 2026
Total Delta
Open Days
Test Delta
How long has this pull request spent in each phase of its lifecycle?
| Fraction of total time | Business days | Phase |
|---|---|---|
|
|
0.0 days | Authoring 1 commit before pull request opened for review |
|
|
1.0 day | Awaiting first review |
| Set up deploy tracking to begin tracking full PR start-to-deploy times | ||
Total time for pull request
1.0 business day
from first commit authored to merge
Deploy tracking has not been set up
Lock file maintenance
This PR contains the following updates:
Update
Change
lockFileMaintenance
All locks refreshed
π§ This Pull Request updates lock files to use the latest dependency versions.
Configuration
π Schedule: (in timezone Asia/Tokyo)
- Branch creation
- "after 9am and before 1pm on Friday"
- Automerge
- At any time (no schedule defined)
π¦ Automerge: Disabled by config. Please merge this manually once you are satisfied.
β» Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.
π» Immortal: This PR will be recreated if closed unmerged. Get config help if that's undesired.
- [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box
This PR was generated by Mend Renovate. View the repository job log.
<!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0NC4xMzQuMSIsInVwZGF0ZWRJblZlciI6IjQ0LjEzNC4xIiwidGFyZ2V0QnJhbmNoIjoibWFzdGVyIiwibGFiZWxzIjpbImF1dG9tZXJnZSIsImRlcGVuZGVuY2llcyJdfQ==-->
PR was closed without comments.